The Company is pleased to announce results of initial metallurgical testing of gold ore samples from its 100%-owned Fountain Head Gold Project. The testwork was designed to assess gold recoveries and regent consumption via standard atmospheric cyanide leaching of gold mineralisation.
The Company recently released a Mineral Resource estimate for the Project of 2.58Mt at 1.7g/t Au for 138,000 oz Au (reported in accordance with the JORC Code, 2012, see ASX release 11 July 2019 for full details including JORC tables). Fountain Head, together with the Iron Blow and Mt Bonnie volcanogenic massive sulphide (VMS) deposits, form the Hayes Creek zinc-gold-silver Project (“the Project”) in the Pine Creek region of the Northern Territory.